top of page

Installation & Commissioning

Professional machine installs across the UK. Typical lead time 7–10 working days, with full on-site commissioning, dial-in and handover.

Install types

From cafes and hospitality to workplaces and serious home setups.

Commercial Espresso

Bench test, on-site install & pressure/flow checks
PID/temperature & pump calibration

Grinder set-up & espresso dial-in
Staff handover (30–60 mins)
Documentation & sign-off
Typical time: 2–4 hrs

Bean-to-Cup

Filtration fit & water hardness calibration
Milk system set-up & menu configuration
Dial-in for taste & throughput
Quick user training & cleaning routines
Typical time: 1.5–3 hrs

Prosumer / Home

Bench test, installation & machine walk-through
Water/filter guidance for longevity
Recipe basics & milk steaming tips
Typical time: 60–90 mins

What’s included (commissioning)

Pre-install bench test & PAT (where applicable)
Fit water filter & set hardness to spec
Connect water, waste & power; verify safety
Pump pressure & flow rate calibration
Temperature profiling / brew boiler checks
Grinder calibration & espresso dial-in
Menu / drink programming (bean-to-cup)
Staff handover: use, cleaning & care
Documentation: settings, warranty & sign-off

What we need from you (site readiness)

Dedicated power supply with isolator within 1m
Cold water feed (3/4” or 3/8”) & waste nearby
Counter cut-outs complete & machine space cleared
Internet (if telemetry/remote support is required)
Safe access & someone available for sign-off


Not ready yet? We can provide a quick site survey and a readiness checklist.

Lead times

Typical installation within 7–10 working days of quote acceptance.

Coverage

UK-wide installs. Free delivery on the Isle of Wight for local orders.

Aftercare

Priority technical support, first-month check-in and servicing plans available.

Our process

1

Consult

We confirm machine model, power/water needs and your menu.

2

Site check

Remote or on-site; we validate services and counter layout.

Install

3

Bench test, fit, calibrate, dial-in, clean-down and set schedules.

Handover

4

Training, documentation and signed commissioning record.

Optional add-ons

Water filter package

Supply & fit, including hardness setup and reminder schedule.

Counter cut-out

Template & cut for drip tray, knock-out or under-counter gear.

Machine move / relocation

De-install, transport & recommission at your new site.

FAQs

How quickly can you install?

Usually within 7–10 working days from quote acceptance and site readiness.

Do you provide plumbing or electrics?

We connect to existing services. If you need trades, we can recommend specs or quote add-ons.

Is training included?

Yes—handover includes operation, cleaning and basic dial-in. Extended training can be added.

What if something isn’t ready on the day?

We’ll do what we can, but re-visits may be chargeable—use our readiness checklist to avoid delays.

Ready to book?

Send a few details and we’ll confirm your lead time.

bottom of page